Skip to content
Monday – Friday: 7:30 a.m. – 4:30 p.m. · Saturday and Sunday: ClosedMonday – Friday: 7:30 a.m. – 4:30 p.m.Plumber's license · VT Lic. 000000VerifyLiability insurance
1 more license
  • Plumber's license · VT Lic. 000000Verify
  • Liability insurance

Radiant floors and hydronic heating, Brattleboro

Heat that is drawn before it is poured

We design each loop to the room it warms, then pipe it, pressure-test it and tune it. Send us the plans and the floor you are laying, and we send back a loop layout.

  • Loops drawn room by room
  • Licensed and insured, numbers in the footer
  • Written scope before work starts
Evening sun falling across a white panel radiator beside a hallway door

Loop layout

Read the manifold: one loop for every stretch of floor

This is the part of a radiant system that you never see once the floor is down. Each numbered part below is something we set, label and write on your drawing.

The red line brings hot water from the boiler. Each white tube goes out to one loop in one room or one stretch of a large room, and comes back to the same manifold. Short loops and long loops are balanced so the whole floor warms together.

  • 1. Supply from the boiler

    The red insulated line carries water at a low temperature, mixed down for the floors.

  • 2. Actuator caps

    Each cap opens its loop when that room's thermostat calls for heat.

  • 3. Flow meters

    One per loop. We set each to the flow on the drawing and write it down.

  • 4. White PEX loops

    One tube out and back for each room, labeled at the manifold with the room's name.

A radiant-floor manifold: a red insulated supply line above, white actuator caps, flow meters and a bundle of white PEX loops running down

What we pipe

Floors first, then everything that feeds them

Most jobs start with a radiant floor. We do the boiler, controls and radiators around it so one firm answers for the whole system.

  • Radiant floors

    Tubing in a slab, under a subfloor or in a thin pour, laid out from your plans and your flooring.

    How heat gets into a floor
  • Boilers and heat pumps

    A condensing boiler that follows what your house already burns, or an air-to-water heat pump when the loops suit it.

  • Radiators and baseboard

    Panel radiators, baseboard and towel warmers for rooms where a floor cannot carry the load. Old cast iron reconnected.

  • Controls and zoning

    A thermostat for each room, outdoor reset and mixing valves, so the floors run only as hot as the day needs.

  • Snow melt

    Loops under a walk, step or short driveway, on their own zone and their own sensor.

  • Service on systems we did not build

    Send a photo of the manifold and the boiler label. We tell you what we see before anyone drives out.

Yearly plan

One visit a year, before the cold

The boiler and the loops get a check each late summer, so the first cold night is not the first time anyone looks.

  • Boiler and loops

    Most systems

    The boiler visit, plus a read of every loop on your radiant manifold.

    • Everything in the boiler visit
    • Flow meters read and loops balanced
    • Floor fluid tested, topped up if it has antifreeze
    • No-heat calls scheduled ahead of non-members in heating season
    • Parts and repairs
    • Fuel and chimney cleaning
    Term:
    Billed once a year.

A plan covers the visit, not the cost of repairs: it is not insurance and not a warranty. Parts and repairs are quoted first and billed separately. Each plan is for one boiler and one manifold; a larger system is quoted before you sign up. The plan renews each year. Cancel any time before the renewal date by phone, text or email, with no fee.

The designer

Mya McCoy draws every system we install

She does the heat-loss numbers, lays out the loops and decides where the manifold goes. Jared Delaney runs service and fires up every boiler we pipe.

Seven of us work out of Flat Street in Brattleboro: a designer, a service lead, four installers and an office manager. You talk to the people who will draw and pipe the system, not a call center.

Mya McCoy

Owner and hydronic designer

Mya McCoy in a hard hat and orange vest, holding a hammer, in a room being renovated

From plan to first fire

Five steps, in the order the floor needs them

The tubing goes in before the concrete, the tile or the boards, so the order matters. Here is ours.

  1. 01

    Step 1: You send plans and the floor schedule

    A floor plan, the insulation, the flooring in each room and the heat source if you have chosen one.

  2. 02

    Step 2: We draw the loops

    Heat loss room by room, loop lengths and spacing, and the manifold's place on the plan.

  3. 03

    Step 3: Rough-in and pressure test

    Tubing down, manifold set, every loop tested before it is covered. The pressure stays on through the pour.

  4. 04

    Step 4: Boiler, pumps and controls

    The mechanical room is piped and wired, then filled and purged of air.

  5. 05

    Step 5: Fire-up and balance

    We set each flow meter to the drawing, show you the thermostats and leave the loop drawing with you.

Customers

What the floors felt like to the people living on them

“Mya drew the loops on our floor plan before we framed the bathroom. The tile crew knew where the manifold went, and nothing was a surprise.”

Colton B.New build, Putney

“We wanted warm floors under the old kitchen without opening the ceiling below. They worked from the basement, and the boards stayed put until the new floor went down.”

Amanda L.Farmhouse renovation, Guilford

“I send the plans and get the loop drawing back with the manifold marked on it. Our pour date held.”

Taylor H.Builder, Brattleboro

Sample reviews.

Service area

Where we install and service

Towns across Windham County. If yours is not on the list, call before you assume.

Farm fields with a barn and silos beneath blue hills

Windham County

  • Brattleboro
  • Putney
  • Dummerston
  • Guilford
  • Vernon
  • Newfane
  • Brookline
  • Townshend
  • Jamaica
  • Whitingham
  • Halifax
  • Bellows Falls
  • Rockingham
  • Saxtons River
  • Grafton
  • Londonderry

We do not go into New Hampshire or north of Grafton and Londonderry. For those, ask a heating contractor near you.

ZIP codes: 05301, 05302, 05303, 05346, 05354, 05345, 05353, 05343, 05101, 05154, 05146, 05148

Asked before the drawing

The questions we hear first from owners and builders.

Can I have radiant floors in a renovation, or only in a new build?

Both. A new slab or subfloor is simplest. In an older house we usually work from below, between the joists, or lay a thin pour or panels over the existing subfloor. Either one can be drawn from a photo and a floor plan.

Which floors work with radiant heat?

Tile, stone and concrete carry heat well. Engineered wood works with a lower water temperature. Thick carpet and some solid wide boards slow the heat, so we ask for the flooring in each room before we draw.

How long does a radiant floor take to warm up?

A slab warms over hours and holds its heat. A lighter system warms faster. We set the thermostats and outdoor reset with you so you are not chasing the floor.

Will I get a price before work starts?

Yes. We draw the loops first, then write the scope and the price from the drawing. Changes go in writing before we do them.

Do you handle permits?

We pull the permits and book the inspections for our own work, and we tell you if your town wants anything more.

Contact

Send the plans, or just the questions

Mya or Jared reads each request and calls or texts you with a time to talk.

Calls and texts(802) 555-0101
Hours
Monday – FridayToday
7:30 a.m. – 4:30 p.m.
Saturday and SundayToday
Closed

We read every request and answer on the next working day.